Core Services
24-Hour Road Surveillance System
24H SURVEILLANCE SYSTEM
Real-time road monitoring through advanced CCTV and IoT sensors. Immediate detection of abnormal situations activates rapid response systems, realizing a safe road environment with no blind spots through full-section coverage.
Immediate Emergency Response
EMERGENCY RESPONSE
Timely response system for traffic accidents, disasters, and emergencies. Rapid field dispatch and recovery support through professional personnel and equipment.
Integrated Traffic Information System
INTEGRATED ITS
Real-time traffic flow analysis and information provision. Realizes optimal route guidance services through big data-based traffic volume prediction.
24-Hour Patrol Operations
24H PATROL OPERATION
Year-round patrol system maintenance for all routes. Professionally trained patrol personnel constantly inspect road conditions and immediately address abnormal factors.
Professional Maintenance
PROFESSIONAL MAINTENANCE
Systematic facility maintenance through professional technical personnel. Maintains road quality and safety at the highest level by integrating advanced maintenance technology.
Operation Sites
Seosuwon~Uiwang Expressway
- Seosuwon~Uiwang
- 13km
- Integrated Operations Management
Pocheon~Hwado Expressway
- Pocheon Soheul ~ Namyangju Hwado
- 28.7km
- Integrated Operations Management
Bibong~Maesong Expressway
- Bibong-myeon~Maesong-myeon, Hwaseong-si
- 8.9km
- Integrated Operations Management
Gwangju~Wonju Expressway
- Gwangju~Wonju
- 56.6km
- Expressway Toll Collection
Sanseong Tunnel
- Hwamyeong-dong~Geumseong-dong~Jangjeon-dong, Buk-gu, Busan
- 5.6km
- Integrated Operations Management
Incheon~Gimpo Expressway
- Incheon~Gimpo
- 28.9km
- Integrated Operations Management
Pyeongtaek~Siheung Expressway
- Pyeongtaek~Siheung
- 42.6km
- Integrated Operations Management
Gyeonggi West Expressway
- Seo-suwon~Osan~Pyeongtaek / Suwon~Gwangmyeong
- 38.5km(Seosuwon) / 27.4km(Suwon)
- Integrated Operations Management
Palryong Tunnel
- Bangye-dong~Bongam-dong~Yangdeok-dong, Changwon-si, Gyeongnam
- 2.6km
- Integrated Operations Management
Cheonan~Nonsan Expressway
- Cheonan~Gongju~Nonsan
- 81km
- Integrated Operations Management
Yongin~Seoul Expressway
- Yongin~Seoul
- 22.9km
- Integrated Operations Management
Sujeongsan Tunnel
- Gaya-dong~Jwacheon-dong, Busanjin-gu, Busan
- 2.3km
- Integrated Operations Management
Ulsan Grand Bridge
- Dong-gu, Ulsan
- 8.4km
- Integrated Operations Management
Coming Soon
Pyeongtaek~Buyeo~Iksan Expressway
- Pyeongtaek Poseung~Buyeo~Iksan
- 137.7km
- Integrated Operations Management